1

Installation of 11/0.4 kV, 50 kVA Sub-Station

2

11 kV Overhead Line with SAC Cable

(1C x 120 sqmm Al/XLEP/XLPE)

3

400 V Line with Aluminium Insulated Cable

(1C x 95 sqmm Al/XLPE)

Leave a Reply

Your email address will not be published. Required fields are marked *

Contact Information

Address:
No.388, Ground Floor (Right), Wireless (3rd) Street, Kabaraye, Mayangone Township, Yangon, Myanmar.


Phone:
(+951) 657 713
Mobile: (+959) 511 0061
Fax:
(+951) 657 713


Email:
yes.kmm@gmail.com, electricalpower@yomaengineering.com
Website: www.yomaengineering.com


map_large