Yoma Engineering

Installation of 11-6.6/0.4 kV, 200 kVA Sub-Station

Installation of 11-6.6/0.4 kV, 200 kVA Sub-Station

Installation of 11 kV Overhead Line SAC Cable (1C x 150 sqmm Al/XLPE/XLPE)

Installation of 11 kV Overhead Line SAC Cable (1C x 150 sqmm Al/XLPE/XLPE)

 Installation of 3Phase (20 kW) Power Meter and 1 No and Single Phase Meter 9 Nos


Installation of 3Phase (20 kW) Power Meter 1 No and Single Phase Meter 9 Nos

 